CONSTRUCTION COST ESTIMATING & MATERIAL TAKEOFFSLet’s talk: +44 7405 107448
← All projects

INDUSTRIAL / STRUCTURAL CONCRETE

4th Unit, Nexus Distribution Park 1

Ireland

4th Unit, Nexus Distribution Park 1 project in Ireland

THE PROJECT

A clear scope.
A considered cost plan.

Concrete estimating for a large industrial unit at Nexus Distribution Park in Ireland, covering the foundations, structural elements and floor slabs.

Our estimating brief focused on structural concrete, bringing the relevant work packages into a structured cost breakdown for the contractor.

Scope of the estimate

  • Excavation and site preparation
  • Reinforced concrete foundations
  • Structural walls, columns and beams
  • Concrete floor slabs, curing and finishing

The information that matters

The estimate brings together measured quantities, material and labour allowances, and the assumptions behind the pricing. This gives the project team a clearer basis for reviewing the scope and planning the next stage.

Planning something similar?

Share your drawings and tell us which packages you need to price.

Request an estimating quote
NEXT PROJECT9 E Dulwich Rd

YOUR NEXT PROJECT STARTS HERE

Great builds start
with clear numbers.

Send us your drawings and project scope.
Let’s work out what comes next.

Discuss your project